Tests and Commissioning

Tests and Commissioning

Factory Acceptance Tests (FAT) are conducted to confirm that the system works correctly before any equipment leaves our development center.

Once our equipment is installed, integration tests and I/O checks are performed to ensure that all wires are correctly connected and the appropriate communication within and across devices is established.

Following integration tests, the commissioning phase begins to ensure the proper performance of all parts of the system.

Afterward, the Site Acceptance Test (SAT) stage takes place, which can be considered as a part of the commissioning process. The goal of this stage is to verify that the application meets the initial Functional Specifications.